Under Regulation 5
(a) carry out any change in operation of his premises;
(b) carry out any work on any premises that may result in a source of emission;
(c) construct on any land, any building or premises designed or used for a purpose that may result in a new source of emission;
(d) make, cause, or permit to be made any change of, to, or in any plant, machine, or equipment used or installed at the premises that causes a material change in the quantity or quality of emission from an existing source; or
(e) carry out any changes or modifications to an existing air pollution control system.
(2) The written notification shall be submitted to the Director General not less than thirty days before the commencement of such work in such form as determined by the Director General.